1.4 Documents and Decks

Course → 1.4 Documents and Decks

Lesson 1.4 of the Free Claude Cowork Course · 25 minutes

Overview

Turn source material into a leadership-ready report and deck. Cowork can generate real Word documents and PowerPoint presentations. In this exercise, draft May’s report from a CSV and Dana’s notes, apply April’s example, review the actual Word file, then reshape it into five slides. The example supplies the structure and voice; your review protects the meaning.

What You’ll Do

✓

Generate a formatted Word report from a folder of source notes

✓

Reshape the reviewed report into a five-slide leadership deck and inspect the risk slide

✓

Use a template file to control formatting, so outputs match your standards

The Lesson

Say “start lesson 1.4” with the course folder open. Use scenarios/report-inputs/monthly-metrics.csv and notes-from-dana.md for a first draft without the example. Then match last-month-report-example.md and save may-report.docx in the course root. Check the Cascadia payment, pipeline cleanup and Tomás’s capacity risk before creating may-report-deck.pptx with headline, numbers, drivers, risks and next month slides. Open both real files and complete the three quiz questions individually.

The template insight is the one to remember: it’s the seed of the shared context folder your team will build in Module 2.

Try It Now

Take one document template your team actually uses — a report format, a one-pager, anything — drop it in a folder, and have Cowork produce a new document following it from any source material you choose.

Follow the exercise: draft, match, review, reshape

Follow a real Lesson 1.4 run in Claude Desktop using the synthetic Alex course folder restored after Lessons 1.1–1.3. Native lossless PNGs are cropped without resampling and annotated with red primary and yellow supporting highlights. App labels and layout can vary by version and plan. Open any image at full size to inspect the text.

1. Resume from saved progress and identify the three inputs

Open the course folder in Cowork and start Lesson 1.4. In a new conversation, ask Claude to read the saved progress rather than repeating earlier lessons. The three inputs are the CSV, Dana’s context notes and an example of the finished report. Keep the example unopened until the second draft.

Read START-HERE.md, instructor/INSTRUCTOR.md, my-progress.md and lessons/1-4-documents-and-decks.md. Start Lesson 1.4 only. Introduce the exercise, then wait. Do not open last-month-report-example.md until the with-example stage.
Claude introduces the three report inputs and confirms the April example stays unopened for the first draft.
1. Resume from saved progress and identify the three inputs. Click the image to view the original PNG.

2. Read the draft without an example

Ask for May’s report using only the CSV and Dana’s notes. This real first draft is accurate but chooses its own summary, six-metric table and section order. Review those choices before supplying the example; do not assume a readable draft matches leadership’s format.

Write Metamorfeus’s May 2026 report from monthly-metrics.csv and notes-from-dana.md in scenarios/report-inputs/. Do not open last-month-report-example.md yet. Show the draft here for review.
The without-example draft has a summary and a six-metric April-to-May comparison table.
2. Read the draft without an example. Click the image to view the original PNG.

3. Apply the example and open the real Word file

Now ask Claude to match the April example and save may-report.docx in the course root. Open the file. This one-page report uses Headline, Numbers, What drove it, Risks & opportunities and Next month. The example chose a headline-first opening and a four-metric, three-column table without a long formatting brief.

Redo it matching the structure, length and voice of scenarios/report-inputs/last-month-report-example.md. Save a real may-report.docx in the course root. Keep Dana’s context and correct May-versus-April arithmetic; do not invent the Cascadia payment amount.
The actual one-page May Word report follows April’s headings and four-metric three-column table.
3. Apply the example and open the real Word file. Click the image to view the original PNG.

4. Check the context and arithmetic before reshaping

Check all three required notes in the saved report: Cascadia’s first milestone payment, two stale leads explaining the pipeline dip, and Tomás’s 91% utilization as a capacity risk. Verify the source arithmetic too. This run caught a small chat-description error: the table has three columns, not two. The saved table itself was correct. Redirect an incorrect output instead of silently rewriting it.

The learner reviews Dana’s context and figures; Claude confirms the report and corrects its table-column description.
4. Check the context and arithmetic before reshaping. Click the image to view the original PNG.

5. Reshape the approved report into five slides

Use the finished report as the deck’s source. Ask for exactly five slides: headline, numbers, drivers, risks and next month. Open may-report-deck.pptx and review every slide. This is a real editable PowerPoint package; the native preview shown here is its first slide.

Turn may-report.docx into a real 5-slide leadership deck, may-report-deck.pptx, in the course root: headline, numbers, drivers, risks, next month. Reshape the finished report, preserving the figures and Dana’s context. Keep text editable and readable.
The first slide of the real five-slide PowerPoint deck states May revenue of $83.6k and 5.7 percent growth.
5. Reshape the approved report into five slides. Click the image to view the original PNG.

6. Review the risk slide rather than trusting the conversion

Inspect slide 4 closely. Team utilization of 75% must not hide Tomás’s 91% capacity risk. The pipeline’s roughly 10% fall is explained by cleanup of two stale leads, and Ferrostar’s renewal timing remains visible. The saved file was checked for five editable slides, valid Office structure and matching source figures.

Slide four shows Tomás at 91 percent as a capacity risk, the pipeline cleanup explanation and Ferrostar renewal.
6. Review the risk slide rather than trusting the conversion. Click the image to view the original PNG.

7. Answer the quiz one question at a time

After reviewing both actual files, answer the three lesson questions individually. Explain what Dana knew beyond the CSV, why an example communicates unstated format choices, and why a deck should reshape a reviewed report. Use your own words before moving to the next question.

Claude confirms the deck review and asks only the first of three Lesson 1.4 quiz questions.
7. Answer the quiz one question at a time. Click the image to view the original PNG.

8. Confirm the files and saved progress

Claude recorded Lesson 1.4 with quiz 3/3 and both real Office filenames. Reopen my-progress.md to verify the saved row. In this run every source and earlier output stayed unchanged, including the April example and the 16 messy-folder originals. The next lesson remains blank; completing a quiz does not itself start another lesson.

Claude confirms quiz 3/3 and the saved Lesson 1.4 progress row naming the real Word report and PowerPoint deck.
8. Confirm the files and saved progress. Click the image to view the original PNG.